Geophysical Work at Worthing Beach Continues

The Barbados Water Authority (BWA) wishes to remind the public that the geophysical work being undertaken at Worthing Beach in Christ Church is still ongoing. This work is being conducted to help determine the conditions for laying the permanent outfall.

The work platform and drilling rig currently on-site, will be moved into the sea at Sandy Beach on Wednesday, May 29th where drilling is expected to continue over the next two weeks, weather and sea conditions permitting.

The drilling may cause discolouration of the water near the rig. Therefore, the Authority is advising divers and sea bathers to exercise caution and stay a safe distance away from the drilling site.

The BWA apologises for the inconvenience that this work may cause and thanks you for your cooperation.

Follow on Instagram

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

Comments

add a comment

Some HTML is OK

or, reply to this post via trackback.

  • Platinum 7 336x280 1
  • Main Template 336x280
  • TrIDent 1
  • BR2 If you saw this then you came to the best place to get seen